Assembly Flight 10A


   Assembly Flight UF-4 Assembly Flight 1J/A  

Launch Date: November 2003
Launch Vehicle: US Space Shuttle
Elements: US Node 2
  • The second of three station connecting modules, Node 2, attaches to end of U.S. Lab and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accomodation Module and later Multi-Purpose Logistics Modules. Unity was the first connecting module, or node, to be launched.
  • Primary docking location for the Shuttle will be a pressurized mating adapter attached to Node 2.

Pages mainteinded by
Claudio Ariotti, IK1SLD



Credits